Paddock Pool Equipment Helps Cherry Point Bring Their Mainside Pool to Life
- Brianna Hines
- Sep 10
- 2 min read

At Paddock Pool Equipment we’re always looking forward. We're searching for ways to bring the best quality products to aquatic centers throughout the world. We’re passionate about providing safe, sustainable, and high functioning aquatic facilities for anyone and everyone spending time in the water. While it’s great to look towards the horizon, sometimes it’s just as helpful to look back upon current and past work. This feature piece aims to do just that, highlighting our involvement with the construction of the MCAS Cherry Point’s Mainside Pool.
The Construction of Cherry Point’s Mainside Pool
Like any project we undertake, the planning and construction of Cherry Point’s Mainside Pool was a highly collaborative process. Designing, building, constructing, and engineering a facility like the Mainside Pool is a team effort. Together, with a team of highly experienced professionals, we were able to achieve the goals laid out for us by Cherry Point. The team on this project was:
The Pool Builder:Â Miracle PoolsÂ
The Architect:Â NAVFAC
The Aquatic Designer:Â Counsilman-HunsakerÂ
The Mechanical Engineer:Â HDR Engineering Inc.Â
What Paddock Pool Equipment was Used
Here at Paddock, we aim to provide as many high quality products as possible, allowing our clients to confidently invest in their aquatic facilities. We offer a wide, often customizable array of products, each geared towards elevating the pools that they’re a part of. Working towards making pools across the world safer, healthier, and performing at the highest level is the core design philosophy of each of these products. The Mainside Pool of Cherry Point is a prime example of how we work with each client individually to meet their unique needs. As such, their facility included the integration of the following Paddock Pool Equipment products:
R300 TGEC Gutter
Gray HDPE Grating
Hand Rails
Grab Rails
Anchors
Escutcheons
Back Strokes
Main Drains

How Cherry Point is Using the Mainside Pool
Since it’s opening, the Mainside Pool has been a crucial part of the Marine Corps Air Station Cherry Point. The facility is used by active duty units, their families, and guests throughout the week. Active duty units can also schedule use time at the pool for things like physical therapy, water polo, swimming, or AMPIT. The implementation of the Mainside Pool is work that we’re immensely proud to have been a part of. Read about past projects and more through our press page.